The Indian Space Research Organization (ISRO) on August 28, 2018 unveiled the details of the Gaganyaan mission for manned space flight before 2022.


The Gaganyaan mission was announced by Prime Minister Narendra Modi during his 72nd Independence Day speech. PM Modi announced that this manned space mission will take Indian astronauts to space on board 'Gaganyaan' by 2022. 

ISRO Chairman, Dr K. Sivan said that the programme will make India the fourth nation in the world to launch a Human Spaceflight Mission. So far, only the USA, Russia and China have launched human spaceflight missions.

`Gaganyaan - India's maiden human spaceflight programme'

• India’s first manned space mission ‘Gaganyaan’ will be launched by Indian Space Research Organisation (ISRO) by 2022. 

• Prior to the actual launch of this manned mission by 2022, the ISRO will launch two unmanned Gaganyaan missions.

• GSLV Mk-III launch vehicle, having the necessary payload capability for this mission, will be used to launch Gaganyaan. 

• The spacecraft will be placed in a low earth orbit of 300-400 km. 

• The spacecraft will comprise of a crew module and service module that constitute an orbital module. 

• It weighs approximately 7 tonnes, and will be carried by a rocket. 

• The crew module’s size will be 3.7 meters and 7 meters. 

• The mission will send a three-member crew to space for a period of five to seven days. 

• After the take off, the manned flight will reach the orbit in 16 minutes

• The crew will do microgravity experiment during the mission. 

• The crew will be selected by Indian Air Force (IAF) and ISRO jointly after which they will undergo training for two-three years. 

• The crew, while coming back to the Earth, could land in the Arabian Sea off the Gujarat coast or in the Bay of Bengal or even on land. 

• The mission may be executed six months before India completes its 75th Independence Day with the help of GSLV Mk-III launch vehicle.

• While ISRO has perfected the engineering aspects of the mission, bioscience is a new field for ISRO and will require collaboration and support from other organisations.

• The programme is expected to be completed before 2022 with first unmanned flight within 30 months. 

• The total programme cost is expected to be less than Rs 10000 crores.